← Back to Blog

TL;DR

56% of procurement teams have adopted automation to handle manual RFQ processes, driven by an 8% increase in workload and 40% rise in sourcing costs. Organizations processing 100+ RFQs monthly see 40-60% cycle time reduction and 50% less administrative work. Key drivers: AI maturity in email parsing, market pressure for efficiency, and sustainability requirements affecting 85% of companies. Implementation typically takes 4-8 weeks technically, 6-9 months to optimize fully.


Sarah Morrison, procurement director at a mid-sized manufacturing firm, used to start her Mondays the same way: opening her inbox to find 47 unread supplier emails, three urgent requests from production, and at least one missed RFQ deadline from the previous week. By Wednesday, she’d still be chasing quotes from suppliers who hadn’t responded. By Friday, she was making sourcing decisions with incomplete data because waiting any longer would delay production.

This isn’t a unique story. It’s the reality for thousands of procurement professionals managing what the industry calls “tail spend” and MRO (Maintenance, Repair, and Operations) purchases—the high-volume, lower-value transactions that individually seem insignificant but collectively account for up to 20% of total procurement spend.

But something fundamental shifted in 2024. According to recent industry research, 56% of procurement decision-makers have now embraced technology to automate their once-manual processes. And the data suggests they’re seeing results that go beyond simple time savings.

The Hidden Cost of Manual RFQ Processing

Let’s start with a number that most procurement teams don’t track: the fully loaded cost of processing a single RFQ manually.

When Amazon Business surveyed procurement leaders for their 2024 State of Procurement Report, they found something striking: 95% of decision-makers acknowledged room for procurement optimization, yet most couldn’t quantify exactly where inefficiencies lived.

Here’s what the research reveals about manual RFQ workflows:

The Email Bottleneck: The Hackett Group’s 2024 Key Issues Study projects an 8% increase in procurement workload this year, creating a 6.6% productivity gap. For teams already managing high RFQ volumes manually, this gap manifests as delayed responses, missed supplier follow-ups, and incomplete competitive analysis.

The Format Problem: Survey data shows that 68% of organizations still rely on email, Word documents, and spreadsheets as their primary RFP/RFQ tools. The challenge isn’t just the tools themselves—it’s that every supplier responds differently. One sends a PDF with pricing tables. Another replies with an Excel sheet in a different format. A third provides a brief email with numbers buried in paragraphs.

Normalizing this data for comparison isn’t just tedious; it’s where errors creep in. Manual data entry, copy-paste mistakes, and overlooked details in dense documents lead to what industry reports categorize as “errors potentially leading to significant business losses.”

The Volume Problem: Companies processing hundreds of RFQs monthly face what one procurement blog describes as “volume overload.” Each incoming quotation requires careful analysis, but manual comparison—especially with inconsistent layouts—is resource-intensive enough that teams often settle for comparing just the top 3-4 responses instead of evaluating all options.

What Changed in 2024-2025

The shift toward automation isn’t driven by technology hype. It’s driven by a convergence of factors that made manual processes increasingly untenable.

Market Volatility

40% of companies reported increased sourcing costs over the past year, driven by inflation, supply chain disruptions, and raw material demand. When margins tighten, the difference between getting 3 quotes versus 7 quotes, or responding in 3 days versus 10 days, directly impacts the bottom line.

AI Maturity

Early procurement automation tools required extensive setup, rigid templates, and still produced unreliable results. But natural language processing has improved dramatically. AI can now extract structured data from unstructured emails with accuracy that makes automation practical, not just theoretical.

Adoption Tipping Point

When 56% of your industry peers adopt a technology, the competitive dynamics change. Companies still operating manually find themselves at a disadvantage—slower to respond to internal stakeholders, slower to evaluate supplier options, less able to track performance trends over time.

How Automation Actually Works (Beyond the Marketing)

Let’s be specific about what modern procurement automation does, separate from vendor promises.

Email Understanding

AI-powered systems use natural language processing to parse incoming RFQ requests and supplier responses. This means identifying key fields—product specs, quantities, delivery dates, pricing—without requiring suppliers to use specific templates or formats.

The technology isn’t perfect. Complex or highly technical specifications still benefit from human review. But for the repetitive, standardized purchases that make up most MRO and tail spend? The accuracy is high enough to be useful.

Supplier Outreach

Instead of manually drafting emails to 5-10 suppliers, automated systems can:

  • Pull from pre-approved supplier lists based on category
  • Generate personalized outreach messages
  • Send requests simultaneously to all relevant vendors
  • Track who’s responded and automatically follow up with non-responders

The time savings here are linear: what took hours now takes minutes.

Quote Normalization

This is where automation provides the most measurable value. When suppliers respond in different formats, AI extracts the key data points—unit price, quantity breaks, lead times, payment terms—and presents them in a standardized comparison view.

Procurement teams report this eliminates 50% of administrative work, according to industry analyses of automation benefits.

Pattern Recognition

Over time, automated systems build a database of supplier responses, pricing trends, and delivery performance. This creates opportunities for predictive analytics—estimating expected price ranges, identifying unusually high or low quotes that warrant investigation, flagging suppliers with declining performance metrics.

What the Data Shows

Let’s look at actual outcomes from organizations that have implemented procurement automation:

Cycle Time Reduction: Companies that embrace AI-driven RFQs report “cutting sourcing times significantly.” While specific benchmarks vary by industry and purchase complexity, reductions of 40-60% in time from RFQ to PO are commonly cited in procurement software case studies.

Efficiency Gains: Industry forecasts suggest automation reduces manual effort by nearly 50%, enabling “faster and more accurate operations.” This aligns with what we hear from procurement leaders: the time saved isn’t just marginal—it’s transformative enough to reallocate resources to strategic work.

Market Growth: The procurement software market is projected to grow at a 10.8% CAGR from 2024 to 2031, reaching $21.9 billion by 2035 according to Future Market Insights. This isn’t speculative growth—it’s driven by measured ROI from early adopters.

Investment Momentum: Perhaps most tellingly, 98% of surveyed organizations report plans to invest in analytics, automation, and AI for procurement operations in the coming years. This level of consensus is rare in enterprise software adoption.


Key Takeaway: Organizations implementing automation see 40-60% faster RFQ cycles, 50% reduction in manual work, and the procurement software market growing at 10.8% annually—driven by measurable ROI, not hype.


The Nuanced Reality

Automation isn’t a magic solution, and it’s worth being honest about limitations and considerations.

Implementation Overhead: While vendors promise “seamless integration,” the reality is that connecting to existing ERPs, setting up supplier databases, and training teams takes time. Most organizations report 4-8 weeks from purchase to productive use.

Change Management: 65% of procurement leaders say they’re betting on AI, but individual team members often resist new workflows. The technology works; getting people to use it consistently requires attention to training and process design.

Not Everything Automates: Complex, strategic sourcing—multi-year contracts, new supplier qualification, highly technical specifications—still requires human judgment. Automation works best for repetitive, high-volume, standardized purchases. That’s still a large portion of total spend, but it’s not everything.

Data Quality Matters: Automated systems are only as good as the data they work with. If your supplier database is outdated, if historical pricing data is incomplete, if product catalogs haven’t been maintained—automation will expose these gaps quickly.

Where Procurement is Heading

The trends for 2025 and beyond are becoming clear:

AI Deepening: Natural language negotiation bots are emerging. Sustainability scoring is being integrated into supplier evaluation. Fraud detection algorithms are getting more sophisticated. The question isn’t whether AI capabilities will improve—it’s how quickly procurement teams can adapt to leverage them.

Ecosystem Integration: Procurement automation doesn’t exist in isolation. Integration with ERP systems, financial planning tools, inventory management, and supplier portals is becoming table stakes. The value compounds when data flows seamlessly across systems.

Sustainability Requirements: 85% of organizations say difficulty sourcing sustainable suppliers prevents them from achieving strategic goals. Automation that can track and score suppliers on ESG metrics addresses a real pain point that manual processes struggle with.

Shifting Skill Requirements: As routine tasks automate, procurement roles are evolving. Less time on email and data entry means more time on supplier relationship management, risk assessment, and strategic category planning. This shift is already underway at organizations that adopted automation 2-3 years ago.

Practical Considerations

If you’re evaluating automation for your procurement function, here’s what matters more than vendor feature lists:

  1. Start with volume analysis: Count your RFQs over the last quarter. If you’re processing fewer than 50 per month, automation ROI may be harder to justify. Above 100 per month, the case becomes compelling.

  2. Assess standardization: Automation works best when purchases are relatively standardized. If every RFQ is a custom, complex requirement, you’ll see less benefit.

  3. Evaluate integration needs: What systems must connect? ERP? Email? Supplier portals? Integration complexity drives implementation timelines and cost.

  4. Consider supplier readiness: Will your suppliers adapt to new processes? Some vendor lists are more tech-forward than others.

  5. Calculate loaded costs: Compare the fully loaded cost of manual processing (including time, errors, and missed opportunities) against automation costs (software, implementation, training). Most organizations underestimate manual costs and overestimate automation costs.

The Bottom Line

The procurement automation wave isn’t coming—it’s here. With 56% adoption among decision-makers and 98% planning investments, the question is less about “if” and more about “when” and “how.”

The organizations seeing the best results aren’t the ones chasing the newest AI features. They’re the ones starting with clear process understanding, setting realistic expectations, and implementing thoughtfully.

Manual RFQ processing still works. It’s just increasingly expensive relative to alternatives, and that gap is widening as automation technology improves and adoption spreads.

For procurement teams like Sarah’s—drowning in email, chasing quotes, making decisions with incomplete data—automation offers something valuable: the ability to focus on work that actually requires human judgment while letting software handle the repetitive heavy lifting.

That’s not a future state. That’s what 56% of your peers are already doing.

Frequently Asked Questions

What is procurement automation?

Procurement automation uses AI and software to handle repetitive RFQ tasks like email parsing, supplier outreach, quote comparison, and data normalization—reducing manual work by up to 50%.

How many procurement teams have adopted automation?

56% of procurement decision-makers have adopted automation as of 2024, with 98% planning investments in AI and automation tools in the coming years.

What results can I expect from procurement automation?

Organizations typically see 40-60% reduction in RFQ cycle time, 50% less manual processing work, increased supplier participation (from 3-4 to 5-7 per RFQ), and better pricing through increased competition.

How long does implementation take?

Technical implementation takes 4-8 weeks, but reaching productive use (where teams consistently use the system) takes 12-16 weeks. Full optimization where you see complete ROI typically takes 6-9 months.

What types of purchases work best for automation?

High-volume, relatively standardized purchases like MRO items, office supplies, and tail spend see the best results. Complex strategic sourcing and highly technical specifications may still require manual handling.

What are the main challenges with procurement automation?

The top challenges are organizational, not technical: insufficient stakeholder buy-in (42%), underestimated change management (38%), poor existing data quality (31%), and integration complexity (27%).

Do I need to change my ERP system?

No. Modern automation tools integrate with existing ERPs via APIs or data exports. You don’t need to replace your current systems.

What’s driving the shift to automation?

Three factors: 8% increase in procurement workload (Hackett Group), 40% increase in sourcing costs due to market volatility, and AI maturity making email parsing and data extraction practical.

How much does procurement automation cost?

Costs vary by vendor and organization size, but ROI typically occurs within 6-14 months through labor savings and better sourcing decisions. Most organizations underestimate the true cost of manual processing.

What industries benefit most from procurement automation?

Manufacturing, healthcare, construction, and any industry processing 100+ RFQs monthly with high tail spend or MRO purchases see the most significant benefits.


Data sources: Amazon Business 2024 State of Procurement Report, The Hackett Group 2024 Key Issues Study, Future Market Insights Procurement Software Market Analysis, GEP procurement trend analyses, and various procurement industry surveys from 2024-2025.